End of July 2009 Construction Update
Posted in post on July 23rd, 2009 by – Comments Off- Interior Wall partitions using Engineered studs. Installation of Ladder on perpendicular walls.
- Installing Plumbing wall-up using PEX (cross-linked Polyethylene) tubing
- HVAC Duct board and PEX Tubing in place.
- Interior Wall partitions with metal studs. Eliminating headers on non-load baring walls.




